Pages that link to "Item:Q1694535"
From MaRDI portal
The following pages link to An optimization algorithm for integrated remanufacturing production planning and scheduling system (Q1694535):
Displaying 7 items.
- Remanufacturing production planning with compensation function approximation method (Q299716) (← links)
- Global search algorithm for automated maintenance planning and scheduling of parts requests (Q1000953) (← links)
- A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning (Q1675586) (← links)
- Integration of production planning and scheduling based on RTN representation under uncertainties (Q2004899) (← links)
- The CVaR convex approximation and SAA method for optimal re-manufacturing production planning (Q2825020) (← links)
- Multi-objective optimization method of remanufacturing processing workshop scheduling under uncertain conditions (Q3180469) (← links)
- Integrated optimization of production planning and scheduling for fixed-position assembly workshop with rework (Q4574657) (← links)