Pages that link to "Item:Q1698281"
From MaRDI portal
The following pages link to Partially concurrent open shop scheduling with integral preemptions (Q1698281):
Displaying 7 items.
- Preemptive open shop scheduling with multiprocessors: Polynomial cases and applications (Q835582) (← links)
- Partially concurrent open shop scheduling with integral preemptions (Q1698281) (← links)
- Restrictions and preassignments in preemptive open shop scheduling (Q1917354) (← links)
- Four decades of research on the open-shop scheduling problem to minimize the makespan (Q2239884) (← links)
- Bounded colouring motivated by the limited resource partially concurrent open shop problem (Q2241155) (← links)
- The representation of partially-concurrent open shop problems (Q2398435) (← links)
- Scheduling with centralized and decentralized batching policies in concurrent open shops (Q2994798) (← links)