Pages that link to "Item:Q1707671"
From MaRDI portal
The following pages link to An integrated model for the transshipment yard scheduling problem (Q1707671):
Displaying 6 items.
- How to park freight trains on rail-rail transshipment yards: the train location problem (Q443824) (← links)
- Levelling crane workload in multi-yard rail-road container terminals (Q2030338) (← links)
- Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards (Q2362173) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- New bounds and algorithms for the transshipment yard scheduling problem (Q2434300) (← links)
- (Q4896277) (← links)