Pages that link to "Item:Q1707828"
From MaRDI portal
The following pages link to Crane scheduling in railway yards: an analysis of computational complexity (Q1707828):
Displaying 4 items.
- Levelling crane workload in multi-yard rail-road container terminals (Q2030338) (← links)
- Minimizing the makespan on a single machine subject to modular setups (Q2124915) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- New bounds and algorithms for the transshipment yard scheduling problem (Q2434300) (← links)