Pages that link to "Item:Q1728364"
From MaRDI portal
The following pages link to A PTAS for a resource scheduling problem with arbitrary number of parallel machines (Q1728364):
Displaying 10 items.
- Problem of parallel machines with polymatroidal constraints (Q922278) (← links)
- Approximation schemes for parallel machine scheduling with non-renewable resources (Q1698888) (← links)
- FPTAS for the two identical parallel machine problem with a single operator under the free changing mode (Q1752167) (← links)
- Scheduling parallel dedicated machines under a single non-shared resource (Q1869718) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q2085740) (← links)
- Minimizing makespan on a single machine with release dates and inventory constraints (Q2184096) (← links)
- Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints (Q2294889) (← links)
- An improved algorithm for parallel machine scheduling under additional resource constraints (Q2693796) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q6108926) (← links)
- Scheduling with non-renewable resources: minimizing the sum of completion times (Q6547136) (← links)