Pages that link to "Item:Q1736634"
From MaRDI portal
The following pages link to An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem (Q1736634):
Displaying 6 items.
- An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems (Q440881) (← links)
- Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout (Q1712074) (← links)
- A shuffled frog-leaping algorithm for multi-objective no-wait flowshop scheduling (Q2918239) (← links)
- (Q3170345) (← links)
- An intercell scheduling approach using shuffled frog leaping algorithm and genetic programming (Q3462676) (← links)
- Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping (Q5059417) (← links)