Pages that link to "Item:Q1738827"
From MaRDI portal
The following pages link to A stochastic optimization approach to shift scheduling with breaks adjustments (Q1738827):
Displaying 10 items.
- A branch-and-bound algorithm for shift scheduling with stochastic nonstationary demand (Q342137) (← links)
- Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns (Q829166) (← links)
- Scheduling workforce relief breaks in advance versus in real-time (Q872250) (← links)
- A two-stage stochastic programming approach for multi-activity tour scheduling (Q1683088) (← links)
- The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers (Q2173054) (← links)
- Constraint-based robust planning and scheduling of airport apron operations through simheuristics (Q2678623) (← links)
- Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling (Q3114668) (← links)
- (Q3802875) (← links)
- Optimal Shift Scheduling with Multiple Break Windows (Q4363620) (← links)
- (Q4487087) (← links)