Pages that link to "Item:Q1744527"
From MaRDI portal
The following pages link to A hybrid constraint programming/mixed integer programming framework for the preventive signaling maintenance crew scheduling problem (Q1744527):
Displaying 7 items.
- A choice function hyper-heuristic framework for the allocation of maintenance tasks in Danish railways (Q1652574) (← links)
- Constraint programming approaches to disassembly line balancing problem with sequencing decisions (Q2026975) (← links)
- Type-2 integrated process-planning and scheduling problem: reformulation and solution algorithms (Q2146989) (← links)
- Railway crew scheduling: models, methods and applications (Q2286960) (← links)
- An extension of Queiroz and Miyazawa's method for vertical stability in two-dimensional packing problems to deal with horizontal stability (Q5059170) (← links)
- Multi-objective model for optimizing railway infrastructure asset renewal (Q5059239) (← links)
- Improving the scheduling of railway maintenance projects by minimizing passenger delays subject to event requests of railway operators (Q6561224) (← links)