From MaRDI portal
The following pages link to Capital- and resource-constrained project scheduling with net present value optimization (Q1752257):
Displaying 14 items.
- Project selection and scheduling with uncertain net income and investment cost (Q297680) (← links)
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows (Q1373161) (← links)
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models (Q1634073) (← links)
- Investment decisions and sensitivity analysis: NPV-consistency of rates of return (Q1754333) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- A quantitative approach for the long-term assessment of railway rapid transit network construction or expansion projects (Q2239999) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Scheduling the construction of value and discount weighted trees for maximum net present value (Q2289887) (← links)
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap (Q2666666) (← links)
- (Q4901420) (← links)
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds (Q5948202) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns (Q6588469) (← links)
- Risk assessment and optimal scheduling of serial projects (Q6617066) (← links)