The following pages link to Linear models for stockpiling in open-pit mine production scheduling problems (Q1753425):
Displaying 17 items.
- MineLib: a library of open pit mining problems (Q363555) (← links)
- Coal bank scheduling using a mathematical programming model (Q1344696) (← links)
- A fuzzy linear programming model for production planning in coal mines (Q1373156) (← links)
- Optimization-based dispatching policies for open-pit mining (Q2129198) (← links)
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem (Q2270449) (← links)
- Managing premium wines using an \((s - 1,s)\) inventory policy: a heuristic solution approach (Q2288883) (← links)
- A new model for automated pushback selection (Q2289883) (← links)
- Open pit mine planning with degradation due to stockpiling (Q2289888) (← links)
- Practical performance of an open pit mine scheduling model considering blending and stockpiling (Q2289890) (← links)
- Production planning and scheduling in mining scenarios under IPCC mining systems (Q2289898) (← links)
- A linear model for surface mining haul truck allocation incorporating shovel idle probabilities (Q2356197) (← links)
- Stockpile scheduling with geometry constraints in dry bulk terminals (Q2668656) (← links)
- A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS (Q3580199) (← links)
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- A model for open-pit pushback design with operational constraints (Q6159500) (← links)
- Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles (Q6159503) (← links)