Pages that link to "Item:Q1761978"
From MaRDI portal
The following pages link to A cutting plane approach for integrated planning and scheduling (Q1761978):
Displaying 11 items.
- A rough-cut capacity planning model with overlapping (Q280165) (← links)
- MILP models for the optimization of real production lines (Q302141) (← links)
- An exact approach based on a new pseudo-polynomial network flow model for integrated planning and scheduling (Q342571) (← links)
- Cut generation for an integrated employee timetabling and production scheduling problem (Q1037686) (← links)
- The application of preprocessing and cutting plane techniques for a class of production planning problems (Q1273528) (← links)
- A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports (Q1751727) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)
- Sawing planning using a multicriteria approach (Q2379779) (← links)
- A hybrid multi-objective approach for real-time flexible production scheduling and rescheduling under dynamic environment in Industry 4.0 context (Q2668716) (← links)
- (Q3139133) (← links)
- An Integrated Model for Job-Shop Planning and Scheduling (Q4017551) (← links)