Pages that link to "Item:Q1762055"
From MaRDI portal
The following pages link to An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055):
Displaying 14 items.
- A diversified shuffled frog leaping: an application for parameter identification (Q274298) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (Q781900) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem (Q1736634) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- Minimizing total weighted late work in the resource-constrained project scheduling problem (Q1792320) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- Improved bat algorithm for project resource balance under generalized priority relation constraint (Q3306965) (← links)
- Local search algorithm for the resource-constrained project scheduling problem (Q5878630) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)