Pages that link to "Item:Q1764772"
From MaRDI portal
The following pages link to Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach (Q1764772):
Displaying 4 items.
- A royalty negotiation model for BOT (build-operate-transfer) projects: the operational revenue-based model (Q409907) (← links)
- Risk measurement and risk identification for BOT projects: A multi-attribute utility approach (Q732656) (← links)
- The risk element transmission theory research of multi-objective risk-time-cost trade-off (Q971715) (← links)
- A hybrid MCDM technique for risk management in construction projects (Q2415050) (← links)