Pages that link to "Item:Q1765554"
From MaRDI portal
The following pages link to A note on a due-date assignment on a two-machine flow-shop (Q1765554):
Displaying 19 items.
- A note on ``Two-machine flow-shop scheduling with rejection'' and its link with flow-shop scheduling and common due date assignment (Q339677) (← links)
- Two-machine flow shop scheduling with nonregular criteria (Q702362) (← links)
- Bicriteria problems to minimize maximum tardiness and due date assignment cost in various scheduling environments (Q708343) (← links)
- Optimal due date assignment in multi-machine scheduling environments (Q835592) (← links)
- Two due date assignment problems in scheduling a single machine (Q867932) (← links)
- Setting a common due date in a constrained flowshop: a variable neighbourhood search approach (Q976037) (← links)
- Optimal due date assignment and resource allocation in a group technology scheduling environment (Q991385) (← links)
- Minmax scheduling problems with a common due-window (Q1000973) (← links)
- Johnson's rule, composite jobs and the relocation problem (Q1011248) (← links)
- An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines (Q1926814) (← links)
- Two-machine flow shop scheduling with a common due date to maximize total early work (Q2116855) (← links)
- Minmax due-date assignment on a two-machine flowshop (Q2241579) (← links)
- Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms (Q2298093) (← links)
- On the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines (Q2342672) (← links)
- Scheduling with due date assignment under special conditions on job processing (Q2434296) (← links)
- Due date assignments and scheduling a single machine with a general earliness/tardiness cost function (Q2459388) (← links)
- Due-date assignment on uniform machines (Q2519077) (← links)
- Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem (Q3541175) (← links)
- Two-Machine Ordered Flow Shop Scheduling with Generalized Due Dates (Q5216799) (← links)