Pages that link to "Item:Q1765745"
From MaRDI portal
The following pages link to Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem (Q1765745):
Displaying 14 items.
- Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements (Q342448) (← links)
- A rollout metaheuristic for job shop scheduling problems (Q702727) (← links)
- Scheduling trains as a blocking parallel-machine job shop scheduling problem (Q1017462) (← links)
- Analysis of reactive deadlock-free scheduling in flexible job shops (Q1028658) (← links)
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell (Q1652331) (← links)
- A DSS based on optimizer tools and MTS meta-heuristic for the warehousing problem with conflicts (Q1708260) (← links)
- A survey of dynamic scheduling in manufacturing systems (Q2268515) (← links)
- Real-time production scheduling in the Industry-4.0 context: addressing uncertainties in job arrivals and machine breakdowns (Q2664358) (← links)
- Multi-stage man-machine cooperated scheduling method for dynamic flexible job shop scheduling problem (Q2994089) (← links)
- A generic deadlock-free reactive scheduling approach (Q3055283) (← links)
- Dynamic job shop scheduling using variable neighbourhood search (Q3163356) (← links)
- Metaheuristics for meltshop scheduling in the steel industry (Q5428974) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry (Q6109347) (← links)