Pages that link to "Item:Q1805493"
From MaRDI portal
The following pages link to Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation (Q1805493):
Displaying 9 items.
- An adaptive crashing policy for stochastic time-cost tradeoff problems (Q342024) (← links)
- A heuristic procedure for solving the dynamic probabilistic project expediting problem (Q948658) (← links)
- Resource allocation for a stochastic CPM-type network through perturbation analysis (Q1342063) (← links)
- On criticality and sensitivity in activity networks (Q1590027) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Managing risk-adjusted resource allocation for project time-cost tradeoffs (Q2095230) (← links)
- Optimal crashing of an activity network with disruptions (Q2149579) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- What you should know about simulation and derivatives (Q3612294) (← links)