Pages that link to "Item:Q1847261"
From MaRDI portal
The following pages link to Commonality and postponement in multistage assembly systems (Q1847261):
Displaying 14 items.
- A delayed product customization cost model with supplier delivery performance (Q319030) (← links)
- A partial-postponement decision cost model (Q1044133) (← links)
- Mining Pareto-optimal modules for delayed product differentiation (Q1044146) (← links)
- An optimal decision model of production-inventory with MTS and ATO hybrid model considering uncertain demand (Q1665065) (← links)
- Analysis of an industrial component commonality problem (Q2462172) (← links)
- Redesign of production flow lines to postpone product differentiation (Q3055277) (← links)
- A decision support framework for global supply chain modelling: an assessment of the impact of demand, supply and lead-time uncertainties on performance (Q3163296) (← links)
- Incentives and Commonality in a Decentralized Multiproduct Assembly System (Q3392102) (← links)
- Product Design Strategy with Commonality by Considering Customer-Choice Behavior in Supply Chain (Q3455881) (← links)
- Balancing of manufacturing systems with complex configurations for delayed product differentiation (Q3518518) (← links)
- Implementation of delayed differentiation in batch process industries: a standardization problem (Q3527939) (← links)
- Simultaneous configuration of platform products and manufacturing supply chains (Q3605431) (← links)
- Push and pull strategies in multi‐stage assembly systems (Q4521319) (← links)
- The impact of component commonality on composite assembly policies (Q5438260) (← links)