Pages that link to "Item:Q1848619"
From MaRDI portal
The following pages link to A search heuristic for the sequence-dependent economic lot scheduling problem (Q1848619):
Displaying 11 items.
- New heuristics for solving the economic lot scheduling problem with reworks (Q542588) (← links)
- On the part inventory model sequencing problem: complexity and beam search heuristic (Q633549) (← links)
- A scheduling policy for adjusting economic lot quantities to a feasible solution (Q858454) (← links)
- Discrete lot sizing and scheduling using product decomposition into attributes (Q1010282) (← links)
- Planning of multi-product pipelines by economic lot scheduling models (Q1694354) (← links)
- A common cycle approach for solving the economic lot and inspection scheduling problem (Q2358853) (← links)
- A profit-maximizing economic lot scheduling problem with price optimization (Q2384842) (← links)
- A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs (Q2467257) (← links)
- Two heuristics for the economic lot scheduling problem: An experimental study (Q3783807) (← links)
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem (Q3981509) (← links)
- Economical production and transshipment policy for coordinating multiple production sites (Q5497383) (← links)