Pages that link to "Item:Q1877042"
From MaRDI portal
The following pages link to Comments on ''Flow shop and open shop scheduling with a critical machine and two operations per job'' (Q1877042):
Displaying 11 items.
- A heuristic method for two-stage hybrid flow shop with dedicated machines (Q339604) (← links)
- The optimal number of used machines in a two-stage flexible flowshop scheduling problem (Q398915) (← links)
- Batch scheduling in a two-stage flexible flow shop problem (Q902743) (← links)
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times (Q1025256) (← links)
- Flow shop and open shop scheduling with a critical machine and two operations per job (Q1590807) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)
- Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type (Q1944074) (← links)
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches (Q2147068) (← links)
- Comments on ``Scheduling jobs on a \(k\)-stage flexible flow-shop'' [Annals of operations research (2008) 164: 29-40] (Q2267320) (← links)
- A two-stage flow shop scheduling with a critical machine and batch availability (Q2978425) (← links)
- Proportionate flow shop: New complexity results and models with due date assignment (Q5249462) (← links)