The following pages link to Wim Nuijten (Q189402):
Displaying 4 items.
- Constraint-based job shop scheduling with Ilog Scheduler (Q1388065) (← links)
- Constraint-based scheduling: Applying constraint programming to scheduling problems. (Q1398125) (← links)
- Satisfiability tests and time-bound adjustments for cumulative scheduling problems (Q1960325) (← links)
- Integration of Rules and Optimization in Plant PowerOps (Q5450917) (← links)