Pages that link to "Item:Q1926828"
From MaRDI portal
The following pages link to Optimizing the supply chain configuration for make-to-order manufacturing (Q1926828):
Displaying 18 items.
- Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns (Q296705) (← links)
- Two bounds for integrating the virtual dynamic cellular manufacturing problem into supply chain management (Q898713) (← links)
- Material compatibility constraints for make-to-order production planning. (Q1412704) (← links)
- Optimal workforce assignment to operations of a paced assembly line (Q1694335) (← links)
- Optimal configuration of a green product supply chain with guaranteed service time and emission constraints (Q1754132) (← links)
- Lead-time quotation and hedging coordination in make-to-order supply chain (Q2116847) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Flexible capacity strategy with multiple market periods under demand uncertainty and investment constraint (Q2356261) (← links)
- Modeling and analysis of build-to-order supply chains (Q2378331) (← links)
- Optimizing production and maintenance for the service-oriented manufacturing supply chain (Q2675630) (← links)
- Optimizing the Supply Chain Configuration for New Products (Q3115917) (← links)
- Simultaneous configuration of platform products and manufacturing supply chains (Q3605431) (← links)
- (Q4984720) (← links)
- Advances in profit-driven order promising for make-to-stock environments – a case study with a Canadian softwood lumber manufacturer (Q5879654) (← links)
- Optimal ordering of operations in a manufacturing chain (Q5952068) (← links)
- Production lead-time hedging and order allocation in an MTO supply chain (Q6096615) (← links)
- MIP heuristics for a resource constrained project scheduling problem with workload stability constraints (Q6134060) (← links)
- An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows (Q6551096) (← links)