Pages that link to "Item:Q1926857"
From MaRDI portal
The following pages link to Parallel dedicated machines scheduling with chain precedence constraints (Q1926857):
Displaying 7 items.
- Handling precedence constraints in scheduling problems by the sequence pair representation (Q511691) (← links)
- On a parallel machine scheduling problem with precedence constraints (Q880562) (← links)
- Scheduling three chains on two parallel machines (Q1040986) (← links)
- Precedence constrained parallel-machine scheduling of position-dependent jobs (Q1676479) (← links)
- Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (Q1788959) (← links)
- Two-dedicated-machine scheduling problem with precedence relations to minimize makespan (Q2448211) (← links)
- Unrelated Parallel Machine Scheduling Problem with Precedence Constraints: Polyhedral Analysis and Branch-and-Cut (Q2835686) (← links)