Pages that link to "Item:Q1927267"
From MaRDI portal
The following pages link to Solving project scheduling problem with the philosophy of fuzzy random programming (Q1927267):
Displaying 9 items.
- Fuzzy project scheduling problem and its hybrid intelligent algorithm (Q967803) (← links)
- Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility (Q2272422) (← links)
- Comparison of a fuzzy genetic and simulated annealing algorithm approach for project time-cost tradeoff (Q2336747) (← links)
- Project scheduling problem with mixed uncertainty of randomness and fuzziness (Q2370337) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Fuzzy longest path problem for project scheduling (Q2929722) (← links)
- (Q3204313) (← links)
- Arithmetic operations for LR mixed fuzzy random variables via mean chance measure with applications (Q5275904) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)