Pages that link to "Item:Q1954598"
From MaRDI portal
The following pages link to Single-machine group scheduling problems with deterioration to minimize the sum of completion times (Q1954598):
Displaying 9 items.
- Single-machine bicriterion group scheduling with deteriorating setup times and job processing times (Q279548) (← links)
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Group scheduling with deteriorating jobs to minimize the total weighted number of late jobs (Q440780) (← links)
- Single machine quadratic penalty function scheduling with deteriorating jobs and group technology (Q611621) (← links)
- Single-machine ready times scheduling with group technology and proportional linear deterioration (Q1991336) (← links)
- Bicriterion scheduling with group technology and deterioration effect (Q2318322) (← links)
- Single-machine group scheduling problems with deterioration consideration (Q2459398) (← links)
- Two scheduling problems in group technology with deteriorating jobs (Q2483767) (← links)
- Solution algorithms for single-machine resource allocation scheduling with deteriorating jobs and group technology (Q5059395) (← links)