Pages that link to "Item:Q1955186"
From MaRDI portal
The following pages link to A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations (Q1955186):
Displaying 7 items.
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria (Q850236) (← links)
- A hybrid multiobjective evolutionary approach for flexible job-shop scheduling problems (Q1954823) (← links)
- An evolutionary approach for resource constrained project scheduling with uncertain changes (Q2664456) (← links)
- (Q3072899) (← links)
- A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem (Q5174108) (← links)