Pages that link to "Item:Q1979194"
From MaRDI portal
The following pages link to Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods (Q1979194):
Displaying 3 items.
- AN OPTIMIZATION MODEL FOR PRECAST PROJECT PLANNING USING GROUP CONCEPTS (Q3006906) (← links)
- The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem (Q5158322) (← links)
- Just‐in‐time scheduling problem with due windows and release dates for precast bridge girders (Q6195034) (← links)