Pages that link to "Item:Q2030338"
From MaRDI portal
The following pages link to Levelling crane workload in multi-yard rail-road container terminals (Q2030338):
Displaying 13 items.
- Planning activities in a network of logistic platforms with shared resources (Q596457) (← links)
- An optimisation framework for yard planning in a container terminal: Case with automated rail-mounted gantry cranes (Q989627) (← links)
- Container supply with multi-trailer trucks: parking strategies to speed up the gantry crane-based loading of freight trains in rail yards (Q1656422) (← links)
- An integrated model for the transshipment yard scheduling problem (Q1707671) (← links)
- Crane scheduling in railway yards: an analysis of computational complexity (Q1707828) (← links)
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals (Q1784912) (← links)
- Loading tow trains ergonomically for just-in-time part supply (Q2301970) (← links)
- Gantry crane and shuttle car scheduling in modern rail-rail transshipment yards (Q2362173) (← links)
- When road trains supply freight trains: scheduling the container loading process by gantry crane between multi-trailer trucks and freight trains (Q2362240) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- Determining crane areas in intermodal transshipment yards: the yard partition problem (Q2655623) (← links)
- Bilevel Optimization of Container Cranes (Q3007055) (← links)
- Scheduling in manufacturing with transportation: classification and solution techniques (Q6586212) (← links)