Pages that link to "Item:Q2034787"
From MaRDI portal
The following pages link to An improved algorithm for a two-stage production scheduling problem with an outsourcing option (Q2034787):
Displaying 3 items.
- Two-stage production scheduling with an outsourcing option (Q2275802) (← links)
- Approximation algorithms for two-machine flow shop scheduling with an outsourcing option (Q5282667) (← links)
- Coordinating scheduling and rejection decisions in a two-machine flow shop scheduling problem (Q6565431) (← links)