Pages that link to "Item:Q2049765"
From MaRDI portal
The following pages link to Robotic disassembly line balancing problem: a mathematical model and ant colony optimization approach (Q2049765):
Displaying 10 items.
- An exact solution method for multi-manned disassembly line design with and/or precedence relations (Q821861) (← links)
- Evolutionary many-objective optimization for mixed-model disassembly line balancing with multi-robotic workstations (Q1728489) (← links)
- Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times (Q2307078) (← links)
- A novel constraint programming and simulated annealing for disassembly line balancing problem with and/or precedence and sequence dependent setup times (Q2676318) (← links)
- (Q2772611) (← links)
- (Q4624714) (← links)
- An efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal times (Q5059254) (← links)
- Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations (Q6048922) (← links)
- A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time (Q6099410) (← links)
- Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem (Q6159499) (← links)