Pages that link to "Item:Q2093185"
From MaRDI portal
The following pages link to On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates (Q2093185):
Displaying 4 items.
- On the complexity of generalized due date scheduling problems (Q1175769) (← links)
- Strong NP-hardness of minimizing total deviation with generalized and periodic due dates (Q2294353) (← links)
- On the parameterized tractability of the just-in-time flow-shop scheduling problem (Q2294891) (← links)
- (Q3197606) (← links)