The following pages link to Stefano Giordani (Q210506):
Displaying 38 items.
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- An approximation result for a duo-processor task scheduling problem (Q286992) (← links)
- A new approach for scheduling independent tasks with multiple modes (Q835753) (← links)
- Finding minimum and equitable risk routes for hazmat shipments (Q856784) (← links)
- A tabu search approach for scheduling hazmat shipments (Q856786) (← links)
- Scheduling models for air traffic control in terminal areas (Q880545) (← links)
- On the effectiveness of the harmonic shelf algorithm for on-line strip packing (Q932692) (← links)
- An asymptotic worst case analysis of the effectiveness of the harmonic 3D-shelf algorithm for online 3D-strip packing (Q975802) (← links)
- On the selection of \(k\) efficient paths by clustering techniques (Q1046590) (← links)
- Minimizing total completion time subject to release dates and sequence-dependent processing times (Q1290157) (← links)
- (Q1366303) (redirect page) (← links)
- An optimal algorithm to find the jump number of partially ordered sets (Q1366304) (← links)
- Complexity and approximation results for scheduling multiprocessor tasks on a ring. (Q1417558) (← links)
- An approximation result for the interval coloring problem on claw-free chordal graphs (Q1613366) (← links)
- Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities (Q2076817) (← links)
- Curriculum-based course timetabling with student flow, soft constraints, and smoothing objectives: an application to a real case study (Q2225651) (← links)
- Location of differentiated waste collection centers with user cooperation: a bilevel optimization approach (Q2300640) (← links)
- A market-based multi-agent system model for decentralized multi-project scheduling (Q2480205) (← links)
- A linear time approximation algorithm for interval coloring on proper interval graphs (Q2708486) (← links)
- (Q2712299) (← links)
- An economic model for resource allocation in grid computing (Q2879492) (← links)
- Grid scheduling by on-line rectangle packing (Q3156825) (← links)
- On the selection of k routes in multiobjective hazmat route planning (Q3576298) (← links)
- (Q4233360) (← links)
- (Q4233384) (← links)
- (Q4250862) (← links)
- (Q4356881) (← links)
- (Q4387265) (← links)
- (Q4426345) (← links)
- (Q4494410) (← links)
- (Q4667082) (← links)
- (Q4836304) (← links)
- Minimizing makespan in a multimode multiprocessor shop scheduling problem (Q4943556) (← links)
- (Q4944995) (← links)
- (Q5708530) (← links)
- Flow Shop No-Wait Scheduling With Sequence Dependent Setup Times And Release Dates (Q5888080) (← links)
- An approximation result for a periodic allocation problem (Q5946816) (← links)
- Scheduling activities in project network with feeding precedence relations: an earliest start forward recursion algorithm (Q6588475) (← links)