Pages that link to "Item:Q2152012"
From MaRDI portal
The following pages link to A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q2152012):
Displaying 5 items.
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- GRASP and path relinking for project scheduling under partially renewable resources (Q2482792) (← links)
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q6102850) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints (Q6588473) (← links)