Pages that link to "Item:Q2152882"
From MaRDI portal
The following pages link to A production inventory supply chain model with partial backordering and disruption under triangular linguistic dense fuzzy lock set approach (Q2152882):
Displaying 6 items.
- Distance measures on trapezoidal fuzzy multi-numbers and application to multi-criteria decision-making problems (Q2099960) (← links)
- Sustainable supply chain model for multi-stage manufacturing with partial backlogging under the fuzzy environment with the effect of learning in screening process (Q2669846) (← links)
- Production and payment policies for an imperfect manufacturing system with discount cash flows analysis in fuzzy random environments (Q5069339) (← links)
- A single-stage cleaner production system with waste management, reworking, preservation technology, and partial backlogging under inflation (Q6186582) (← links)
- Optimal inventory policies for time varying deteriorating items with dynamic demand under upstream and downstream trade credit by discounted cash-flow analysis (Q6191689) (← links)
- Two-echelon supply chain with production disruption and controllable deterioration considering carbon emission under Stackelberg game approach (Q6594023) (← links)