Pages that link to "Item:Q2165284"
From MaRDI portal
The following pages link to Minimizing total weighted late work on a single-machine with non-availability intervals (Q2165284):
Displaying 7 items.
- Approximation algorithms for maximizing the weighted number of early jobs on a single machine with non-availability intervals (Q498410) (← links)
- Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval (Q1793403) (← links)
- Single-machine scheduling with operator non-availability to minimize total weighted completion time (Q2195317) (← links)
- A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints (Q2256319) (← links)
- Single-machine common due date total earliness/tardiness scheduling with machine unavailability (Q2286433) (← links)
- Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times (Q2456641) (← links)
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work (Q6057022) (← links)