Pages that link to "Item:Q2182814"
From MaRDI portal
The following pages link to Earth pressure field modeling for tunnel face stability evaluation of EPB shield machines based on optimization solution (Q2182814):
Displaying 6 items.
- Mechanical behavior of segment rebar of shield tunnel in construction stage (Q943131) (← links)
- Earth pressure balance control for EPB shield (Q1047383) (← links)
- Lagged settlement in sandy cobble strata and earth pressure on shield tunnel (Q2045424) (← links)
- Preface: Advances in theory and real world applications of control and dynamic optimization (Q2182801) (← links)
- Optimal control of earth pressure balance of shield tunneling machine based on dual‐heuristic dynamic programming (Q5003607) (← links)
- Tunnel stability analysis during construction using a neuro‐fuzzy system (Q5435702) (← links)