Pages that link to "Item:Q2225062"
From MaRDI portal
The following pages link to Scheduling with non-renewable resources: minimizing the sum of completion times (Q2225062):
Displaying 8 items.
- Scheduling under a non-reversible energy source: an application of piecewise linear bounding of non-linear demand/cost functions (Q284842) (← links)
- A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource (Q2059081) (← links)
- New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints (Q2078845) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q2085740) (← links)
- Scheduling unit-time tasks in renewable resource constrained flowshops (Q4031376) (← links)
- (Q5187058) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q6108926) (← links)
- A multivariate complexity analysis of the material consumption scheduling problem (Q6136081) (← links)