Pages that link to "Item:Q2239938"
From MaRDI portal
The following pages link to The bilevel optimisation of a multi-agent project scheduling and staffing problem (Q2239938):
Displaying 3 items.
- Nash equilibria for the multi-agent project scheduling problem with controllable processing times (Q2018940) (← links)
- Necessary optimality conditions for nonsmooth multi-objective bilevel optimization problem under the optimistic perspective (Q2156713) (← links)
- Multiagent approach to solve project team work allocation problems (Q3055397) (← links)