Pages that link to "Item:Q2242185"
From MaRDI portal
The following pages link to An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185):
Displaying 35 items.
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (Q1129955) (← links)
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- Integration of routing into a resource-constrained project scheduling problem (Q2175371) (← links)
- A project scheduling problem with periodically aggregated resource-constraints (Q2669745) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- Application of idempotent algebra methods in genetic algorithm for solving the scheduling problem (Q5871445) (← links)
- R-SALSA: a branch, bound, and remember algorithm for the workload smoothing problem on simple assembly lines (Q6069213) (← links)
- New pseudo polynomial algorithms for a partial resource-constrained project scheduling problem (Q6102886) (← links)
- Literature reviews in operations research: a new taxonomy and a meta review (Q6106580) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- MIP heuristics for a resource constrained project scheduling problem with workload stability constraints (Q6134060) (← links)
- A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff (Q6146634) (← links)
- Continuous-time formulations for multi-mode project scheduling (Q6164343) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- Exact algorithms for a parallel machine scheduling problem with workforce and contiguity constraints (Q6551087) (← links)
- Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: an experimental comparison (Q6551095) (← links)
- A genetic algorithm for the resource-constrained project scheduling problem with alternative subgraphs using a Boolean satisfiability solver (Q6565426) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)
- Integer optimization models and algorithms for the multi-period non-shareable resource allocation problem (Q6572832) (← links)
- A robust multi-project scheduling problem under a resource dedication-transfer policy (Q6573375) (← links)
- An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem (Q6588464) (← links)
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem (Q6588468) (← links)
- Resource overload problems with tardiness penalty: structural properties and solution approaches (Q6588471) (← links)
- Measuring the slack between lower bounds for scheduling on parallel machines (Q6588485) (← links)
- Metric estimation approach for managing uncertainty in resource leveling problem (Q6588500) (← links)
- A new mathematical model for hybrid flow shop under time-varying resource and exact time-lag constraints (Q6629023) (← links)
- Resource leveling: complexity of a unit execution time two-processor scheduling variant and related problems (Q6657887) (← links)
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems (Q6659821) (← links)