Pages that link to "Item:Q2257290"
From MaRDI portal
The following pages link to Integrated production and delivery scheduling on a serial batch machine to minimize the makespan (Q2257290):
Displaying 10 items.
- Online integrated production-distribution scheduling problems without preemption (Q281801) (← links)
- Integrated scheduling of production and delivery on a single machine with availability constraint (Q476906) (← links)
- Integrated production and transportation on parallel batch machines to minimize total weighted delivery time (Q1628115) (← links)
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs (Q1698887) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- Improved approximation algorithm for scheduling on a serial batch machine with split-allowed delivery (Q2176828) (← links)
- Integrated scheduling problem on a single bounded batch machine with an unavailability constraint (Q2657417) (← links)
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms (Q5139609) (← links)
- (Q5282473) (← links)
- Integrated production and batch delivery scheduling for perishable products (Q5368176) (← links)