Pages that link to "Item:Q2267382"
From MaRDI portal
The following pages link to A sequencing approach for creating new train timetables (Q2267382):
Displaying 17 items.
- An integrated approach for earthwork allocation, sequencing and routing (Q296873) (← links)
- Optimisation models for expanding a railway's theoretical capacity (Q322775) (← links)
- Determining operations affected by delay in predictive train timetables (Q336779) (← links)
- Optimising a coal rail network under capacity constraints (Q656055) (← links)
- A job-shop scheduling approach for optimising sugarcane rail operations (Q656056) (← links)
- ACS-TS: Train scheduling using ant colony system (Q955488) (← links)
- Techniques for restricting multiple overtaking conflicts and performing compound moves when constructing new train schedules (Q969881) (← links)
- An integrated approach for scheduling health care activities in a hospital (Q1681540) (← links)
- A flexible job shop scheduling approach with operators for coal export terminals (Q1725593) (← links)
- A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain (Q1926728) (← links)
- A heuristic approach to solving the train traffic re-scheduling problem in real time (Q2331466) (← links)
- A disjunctive graph model and framework for constructing new train schedules (Q2379528) (← links)
- Stockpile scheduling with geometry constraints in dry bulk terminals (Q2668656) (← links)
- Scheduling Trains on Parallel Lines with Crossover Points (Q3401662) (← links)
- THE TWO-TRAIN SEPARATION PROBLEM ON LEVEL TRACK WITH DISCRETE CONTROL (Q4556428) (← links)
- An efficient heuristic method for joint optimization of train scheduling and stop planning on double-track railway systems (Q5882416) (← links)
- A matheuristic for tactical locomotive and driver scheduling for the swiss national railway company SBB Cargo AG (Q6201534) (← links)