Pages that link to "Item:Q2270449"
From MaRDI portal
The following pages link to A strengthened formulation and cutting planes for the open pit mine production scheduling problem (Q2270449):
Displaying 28 items.
- Long term production planning of open pit mines by ant colony optimization (Q300074) (← links)
- Aggregation heuristic for the open-pit block scheduling problem (Q321137) (← links)
- Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty (Q323260) (← links)
- Clique-based facets for the precedence constrained knapsack problem (Q431007) (← links)
- Tailored Lagrangian relaxation for the open pit block sequencing problem (Q490234) (← links)
- The precedence constrained knapsack problem: separating maximally violated inequalities (Q494425) (← links)
- A continuous framework for open pit mine planning (Q627452) (← links)
- Optimality conditions for the continuous model of the final open pit problem (Q828728) (← links)
- The new Fundamental Tree Algorithm for production scheduling of open pit mines (Q856303) (← links)
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines (Q887202) (← links)
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity (Q958440) (← links)
- An application of branch and cut to open pit mine scheduling (Q1407258) (← links)
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty (Q1926975) (← links)
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers (Q2030539) (← links)
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem (Q2160495) (← links)
- Strategic planning of an underground mine with variable cut-off grades (Q2218873) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- Open pit mine planning with degradation due to stockpiling (Q2289888) (← links)
- Hyper-heuristic approaches for strategic mine planning under uncertainty (Q2289889) (← links)
- Practical performance of an open pit mine scheduling model considering blending and stockpiling (Q2289890) (← links)
- Evolutionary approach for large-scale mine scheduling (Q2663534) (← links)
- Cover by disjoint cliques cuts for the knapsack problem with conflicting items (Q2670441) (← links)
- Large-scale multi-period precedence constrained knapsack problem: a mining application (Q2883587) (← links)
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm (Q5058828) (← links)
- Concurrent open-pit mine production and in-pit crushing–conveying system planning (Q5059445) (← links)
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- A model for open-pit pushback design with operational constraints (Q6159500) (← links)