Pages that link to "Item:Q2271830"
From MaRDI portal
The following pages link to A solution for cyclic scheduling of multi-hoists without overlapping (Q2271830):
Displaying 16 items.
- Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times (Q282247) (← links)
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- An evolutionary approach for the design and scheduling of electroplating facilities (Q928697) (← links)
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line (Q1779707) (← links)
- An improved hybrid model for the generic hoist scheduling problem (Q1854759) (← links)
- Single hoist cyclic scheduling with multiple tanks: A material handling solution (Q1870835) (← links)
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times (Q2466598) (← links)
- Cyclic hoist scheduling in large real-life electroplating lines (Q2642305) (← links)
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints (Q3989141) (← links)
- Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions (Q4380546) (← links)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows (Q5058816) (← links)
- Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach (Q5322012) (← links)
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem (Q5322091) (← links)