Pages that link to "Item:Q2282368"
From MaRDI portal
The following pages link to Minimizing maximum tardiness and delivery costs with batch delivery and job release times (Q2282368):
Displaying 6 items.
- A knowledge-based approach for multi-factory production systems (Q1652022) (← links)
- Optimal delivery time quotation in supply chains to minimize tardiness and delivery costs (Q2018942) (← links)
- On-line order batching and sequencing problem with multiple pickers: a hybrid rule-based algorithm (Q2290119) (← links)
- Reducing Delivery Delay in HRM Tree (Q3599051) (← links)
- Minimizing the Range of Order Completion Times with Multiple Job Classes (Q4273304) (← links)
- Two heuristic methods based on decomposition to the integrated multi-agent supply chain scheduling and distribution problem (Q5038175) (← links)