Pages that link to "Item:Q2283853"
From MaRDI portal
The following pages link to Single machine scheduling problem with interval processing times and total completion time objective (Q2283853):
Displaying 7 items.
- Single machine scheduling problem with interval processing times to minimize mean weighted completion time (Q337133) (← links)
- Minimizing total weighted completion time with uncertain data: a stability approach (Q612208) (← links)
- Optimality region for job permutation in single-machine scheduling with uncertain processing times (Q827990) (← links)
- Minimizing total weighted flow time under uncertainty using dominance and a stability box (Q1762112) (← links)
- Editorial. Special issue on algorithms for scheduling problems (Q2331616) (← links)
- Measures of problem uncertainty for scheduling with interval processing times (Q2393127) (← links)
- Uncertainty measure for the Bellman-Johnson problem with interval processing times (Q2452733) (← links)