Pages that link to "Item:Q2289898"
From MaRDI portal
The following pages link to Production planning and scheduling in mining scenarios under IPCC mining systems (Q2289898):
Displaying 5 items.
- Staff and machine shift scheduling in a German potash mine (Q1702661) (← links)
- Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions (Q1752139) (← links)
- Concurrent open-pit mine production and in-pit crushing–conveying system planning (Q5059445) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- A nested multiple-objective optimization algorithm for managing production fleets in surface mines (Q6495564) (← links)