Pages that link to "Item:Q2293881"
From MaRDI portal
The following pages link to A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production (Q2293881):
Displaying 10 items.
- The hot strip mill production scheduling problem: A tabu search approach (Q1609896) (← links)
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill (Q1761983) (← links)
- A multi-objective hot-rolling scheduling problem in the compact strip production (Q1984951) (← links)
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants (Q2003439) (← links)
- New integer programming models for slab stack shuffling problems (Q2109751) (← links)
- Modeling and application for rolling scheduling problem based on TSP (Q2243302) (← links)
- Queuing search algorithm: a novel metaheuristic algorithm for solving engineering optimization problems (Q2306943) (← links)
- The hot-rolling batch scheduling method based on the prize collecting vehicle routing problem (Q2379818) (← links)
- (Q3064888) (← links)
- Scheduling a hot rolling mill (Q5428937) (← links)