Pages that link to "Item:Q2294889"
From MaRDI portal
The following pages link to Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints (Q2294889):
Displaying 17 items.
- Approximation schemes for single machine scheduling with non-renewable resource constraints (Q398908) (← links)
- Single machine scheduling problems with financial resource constraints: some complexity results and properties (Q554491) (← links)
- NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion time (Q859949) (← links)
- Minimizing the total weighted completion time in the relocation problem (Q964872) (← links)
- Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption (Q1341400) (← links)
- Approximability of total weighted completion time with resource consuming jobs (Q1785443) (← links)
- A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource (Q2059081) (← links)
- New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints (Q2078845) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q2085740) (← links)
- A global constraint for total weighted completion time for unary resources (Q2430362) (← links)
- Pareto optimal algorithms for minimizing total (weighted) completion time and maximum cost on a single machine (Q2686863) (← links)
- Efficiency of equilibria in restricted uniform machine scheduling with total weighted completion time as social cost (Q3120568) (← links)
- Machine Scheduling to Minimize Weighted Completion Times (Q4636336) (← links)
- Weighted Completion Time Minimization for Unrelated Machines via Iterative Fair Contention Resolution (Q5146966) (← links)
- EPTAS for load balancing problem on parallel machines with a non-renewable resource (Q6108926) (← links)
- A multivariate complexity analysis of the material consumption scheduling problem (Q6136081) (← links)
- Scheduling with non-renewable resources: minimizing the sum of completion times (Q6547136) (← links)