Pages that link to "Item:Q2329576"
From MaRDI portal
The following pages link to Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem (Q2329576):
Displaying 9 items.
- A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms (Q342413) (← links)
- Evolutionary multiobjective optimization for the multi-machine flow shop scheduling problem under blocking (Q1615967) (← links)
- A multi-objective evolutionary algorithm guided by directed search for dynamic scheduling (Q1652172) (← links)
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers (Q2030539) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Multi-objective evolutionary algorithm for solving energy-aware fuzzy job shop problems (Q2156606) (← links)
- A hybrid many-objective evolutionary algorithm for flexible job-shop scheduling problem with transportation and setup times (Q2668713) (← links)
- A double-objective inherited genetic algorithm for dual resource constrained job shop (Q2917813) (← links)
- Multi-objective evolutionary optimization based on online perceiving Pareto front characteristics (Q6139521) (← links)