Pages that link to "Item:Q2341222"
From MaRDI portal
The following pages link to Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem (Q2341222):
Displaying 8 items.
- Maximizing total tardiness on a single machine in \(O(n^2)\) time via a reduction to half-product minimization (Q256707) (← links)
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem (Q733546) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem (Q1736622) (← links)
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups (Q2565776) (← links)
- When serial batch scheduling involves parallel batching decisions: a branch and price scheme (Q2669619) (← links)
- Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups (Q5059220) (← links)