Pages that link to "Item:Q2352264"
From MaRDI portal
The following pages link to Unary NP-hardness of minimizing the total deviation with generalized or assignable due dates (Q2352264):
Displaying 11 items.
- Unary NP-hardness of minimizing total weighted tardiness with generalized due dates (Q1785477) (← links)
- Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty (Q2045022) (← links)
- Scheduling with generalized and periodic due dates under single- and two-machine environments (Q2115317) (← links)
- A single machine scheduling with generalized and periodic due dates to minimize total deviation (Q2127609) (← links)
- Single machine scheduling with rejection and generalized parameters (Q2149874) (← links)
- Unary NP-hardness of single-machine scheduling to minimize the total tardiness with deadlines (Q2286436) (← links)
- Strong NP-hardness of minimizing total deviation with generalized and periodic due dates (Q2294353) (← links)
- Unary NP-hardness of minimizing the number of tardy jobs with deadlines (Q2398650) (← links)
- Just-In-Time Scheduling with Generalized Due Dates and Identical Due Date Intervals (Q4561184) (← links)
- Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity (Q6109346) (← links)
- Order acceptance and scheduling with delivery under generalized parameters (Q6179281) (← links)